Quality inspection process

All devices and machines shown below are the property of RZT watch company

1: Incoming Material Registration and Quarantine

Our assembly center has a front door and a back door, all raw materials are delivered to our back door via elevator.

Company ReceptionBack Door

2: Incoming Quality Control (IQC)
Inspect movements, cases, dials, hands, crystals, crowns, case backs, straps, gaskets, and packaging materials.

3: Appearance and Dimensional Inspection
Check for scratches, color differences, stains, burrs, deformation, plating quality, and critical assembly dimensions.

4: Customization Verification
Verify logos, text, colors, engravings, dial graphics, buckle markings, and packaging details against the approved sample.

5: Movement Pre-Inspection
Check the movement model, timekeeping, functions, appearance, and batch consistency. For quartz movements, also check the battery and current consumption.

Quartz Movement Tester

WeishiQT-8000B

 Automatic Movement Tester

6: Component Cleaning and Dust Control
Clean the dial, hands, crystal, and inside of the case, and assemble them in a dust-controlled environment.

7: Dial Installation
Fit the dial to the movement and check its orientation, position, flatness, and security.

8: Hand Installation
Install the hour, minute, second, and function hands, checking their height, parallelism, and centering.

9: Hand Alignment Inspection
Check alignment at 12 o'clock, date-change position, hand clearance, and any rubbing or obstruction.

10: Case and Crystal Inspection
Inspect crystal installation, internal case cleanliness, gasket grooves, and the case surface.

11: Casing the Movement
Install the movement assembly into the case and check its positioning, movement holder, and stability.

12: Crown and Stem Installation
Adjust the stem length and fit the crown. Check winding, time setting, date setting, and crown-position operation.

13: Gasket Installation and Lubrication
Inspect and install the crown, case-back, and crystal gaskets, applying sealing grease as required.

14: Case-Back Assembly
Remove internal dust, install the case back, and tighten it to the specified torque.

15: Post-Assembly Visual Inspection
Check the inside and outside of the crystal for dust, fingerprints, or scratches, and confirm that the dial and hands are correctly positioned.

16: Functional Testing
Test timekeeping, hacking, winding, time setting, date, day, chronograph, luminous display, and other customized functions.

17: Timekeeping Accuracy Test
For mechanical watches, test daily rate, amplitude, and beat error. For quartz watches, check timekeeping and current-consumption parameters.

18: Water-Resistance Test
Perform air-pressure or water-pressure testing according to the specified rating, checking the seals around the case, crown, crystal, and case back.

This machine can test waterproofing up to 200 meters

Vacuum Waterproof Tester

True water tester

True water tester

19: Aging and Stability Test
Run the watches for the specified period and monitor for stopping, gaining, losing, incorrect date changes, or function failure.

20: Strap and Buckle Installation
Install the strap, bracelet, and buckle, checking orientation, security, opening and closing, and lug positioning.

21: 100% Finished-Watch Inspection
Inspect every finished watch for appearance, functions, customization details, timekeeping, water-resistance results, and accessory completeness.

22: Pre-Packaging Cleaning
Clean the case, crystal, and strap, apply protective films, and ensure the product is free of stains and fingerprints.

23: Packaging and Label Verification
Verify that the watch, manual, warranty card, hangtag, barcode, gift box, and carton information are consistent.

24: Outgoing Quality Control (OQC)
Conduct sampling inspections of finished-product appearance, functions, quantity, packaging, and shipping protection.

25: Quality Release and Shipment
Complete inspection and traceability records. Approve conforming products for shipment, while isolating nonconforming products for rework or disposition.